IA-05
Engagement Planning Kit
Plan each engagement: scope, risks, fraud, time budget and the document request list.
IA-06
Understand and document the process, then build the risk and control matrix and the audit program.

A control cannot be tested before the process around it is understood. It starts with a narrative of the process as it actually runs (401), a flowchart with its control points (40101), a walkthrough (402) to confirm it, and interview minutes (405). From there the risk and control matrix (403) records each control's type, frequency and owner, the test of design (40301) asks whether each control addresses its risk, and the audit program (404) sets the test steps for each control, cross-referenced to the testing papers. The Excel and Word templates include filled examples for Al Rawasi Trading Company; the flowchart (40101) is a PowerPoint template without an example.
Audit firm teams and in-house internal audit departments on assurance engagements, after engagement planning (IA-05) and before testing (IA-07).
| Code | Paper | Format | What you get | Reference |
|---|---|---|---|---|
| 401 | Process NarrativeReference: 14.1 | Word | Template + worked exampleTemplate + example | 14.1 |
| 40101 | Process FlowchartReference: 14.1 | PPT | TemplateTemplate | 14.1 |
| 402 | WalkthroughReference: 14.1 | Word | Template + worked exampleTemplate + example | 14.1 |
| 403 | Risk and Control Matrix (RCM)Reference: 13.2, 13.4 | Excel | Template + worked exampleTemplate + example | 13.2, 13.4 |
| 40301 | Test of Design (TOD)Reference: 14.2 | Excel | Template + worked exampleTemplate + example | 14.2 |
| 404 | Audit ProgramReference: 13.6 | Excel | Template + worked exampleTemplate + example | 13.6 |
| 405 | Interview MinutesReference: 14.1 | Word | Template + worked exampleTemplate + example | 14.1 |
Every kit also includes a user guide (PDF and PowerPoint) and the licence terms, in Arabic and English.
IIA Global Internal Audit Standards (2024) references, with ISQM 1 and SAMA principles where they apply, as given in the guide. References are for cross-referencing and do not imply IIA endorsement.
IA-05
Plan each engagement: scope, risks, fraud, time budget and the document request list.
8 templatesSAR 249
IA-07
Test controls with documented samples and results a reviewer can follow.
9 templatesSAR 349
IA-08
Review IT and cybersecurity controls with templates referenced to the NCA Essential Cybersecurity Controls (ECC).
7 templatesSAR 399