IA-06
Process Understanding and Control Assessment Kit (RCM)
Understand and document the process, then build the risk and control matrix and the audit program.
IA-07
Test controls with documented samples and results a reviewer can follow.

Testing files often fail review for the same reasons: a sample with no stated basis, a population nobody reconciled, and results scattered across tabs. This kit sets the selection method and sample size, with the rationale, in 501, reconciles the population to the system or general ledger in 50101, and records the selected items in 50102. Each control gets its own TOE sheet (50201) linking every item to its result and evidence reference, with evidence filed in folder 506 under the test sheet's full code. 507 summarises each control as effective, ineffective or with exceptions, and 508 logs any scope limitation and its effect.
Audit firms and in-house internal audit departments during fieldwork on assurance engagements, once the RCM and work programme from IA-06 are in place.
| Code | Paper | Format | What you get | Reference |
|---|---|---|---|---|
| 501 | Sampling MethodologyReference: 14.1 | Excel | Template + worked exampleTemplate + example | 14.1 |
| 50101 | Population Receipt and ReconciliationReference: 14.1 | Excel | Template + worked exampleTemplate + example | 14.1 |
| 50102 | Sample SelectionReference: 14.1 | Excel | Template + worked exampleTemplate + example | 14.1 |
| 502 | Tests of Operating Effectiveness (TOE)Reference: 14.2 | Excel | Template + worked exampleTemplate + example | 14.2 |
| 50201 | Control Test SheetReference: 14.2 | Excel | Template + worked exampleTemplate + example | 14.2 |
| 503 | Analytics and Data AnalysisReference: 14.2 | Excel | Template + worked exampleTemplate + example | 14.2 |
| 504 | Substantive Detail TestingReference: 14.2 | Excel | Template + worked exampleTemplate + example | 14.2 |
| 506 | Supporting EvidenceReference: 14.6 | — | Evidence folderEvidence folder | 14.6 |
| 507 | Summary of Test ResultsReference: 14.2, 14.3 | Excel | Template + worked exampleTemplate + example | 14.2, 14.3 |
| 508 | Scope Limitation LogReference: 13.3, 15.1 | Excel | Template + worked exampleTemplate + example | 13.3, 15.1 |
Every kit also includes a user guide (PDF and PowerPoint) and the licence terms, in Arabic and English.
IIA Global Internal Audit Standards (2024) references, with ISQM 1 and SAMA principles where they apply, as given in the guide. References are for cross-referencing and do not imply IIA endorsement.
IA-06
Understand and document the process, then build the risk and control matrix and the audit program.
7 templatesSAR 349
IA-09
Rate findings, write them clearly and issue a report for management and the Audit Committee.
9 templatesSAR 299